New generation energy sources

Leading the world in clean energy is tri-generation. The system is able to produce three types of energy: electricity, heating and cooling at the same time, resulting in power, hot water, space heating and air conditioning - all from one energy source. Tri-generation facilities retain the heat that is lost from a generator that produces electricity and reuses it to create hot and cold water. An absorption chiller keeps the water at low enough temperatures for reuse as air conditioning.

The result: an energy saving up to 45% compared to traditional electricity generation.

BENEFITS OF TRI-GENERATION

  • Reduces the emission of pollutants
  • Minimises your carbon footprint
  • Better use of fossil fuels
  • More usable energy, less wastage
  • Cuts peak electrical loads
  • Tri-generation systems translate into substantial energy and pollution saving

Case Study: MTN Tri-generation Project, South Africa

Profile

National power shortages and the potential risk of carbon taxes on energy consumption presented a challenge of maintaining operations reliably and cost-effectively. MTN South Africa took the initiative to generate a self-sustaining power supply initiative at its head-office, and off-set carbon emissions.

The Solution

The company prepared to develop a 2-megawatt (MW), methane-driven tri-generation power plant, the first of its kind on the African continent, which simultaneously produces electricity, heat, and chilled water.

Its journey to the MTN Campus at 14th Avenue in Fairlands, Johannesburg, covers a distance of 874kms, from the Mozambique coast via Secunda and Sasol to Egoli Gas. A grid at the MTN Campus is connected to Egoli Gas to transport the gas down a pipeline to the tri-generation plant.

Methane, a clean-burning, sustainable natural gas with a reliable and consistent supply, is burnt to generate electricity. This energy is used to power some of MTN South Africa's data and switching centres and server rooms. Heat that is generated as a by-product of the process is sent through lithium bromide absorption chillers, which cool water, which is then used for the cooling air for electronic equipment, as well as for office air-conditioning needs. Through second re-absorption cycle, the plant produces a further 800kW free cooling through the head office campus.

The Result

  • 85% efficiencies have helped reduce both costs and greenhouse gas emissions
  • Waste water from the process is utilised in bathroom facilities
  • Greenhouse gas (GHG) emissions of over 17,500 tonnes per annum from carbon intensive electricity generation have also been avoided
  • Increased energy security in an energy constrained economy
  • No energy price increases
  • Reduced exposure to potential carbon taxes
  • Reduction of the Group carbon footprint
  • A consistent and reliable supply of energy

Source: www.mtn.com

R71-million Joburg gas conversion project starts - click here for more 

Absa Towers West: Going Green - click here for more 

Inner city Energy Centre - click here for more 

ABSA Campus Energy Project, Johannesburg - click here for more 

Gas-powered generators at Absa's Joburg campus - click here fore more

ABSA's Eco-friendly Office Tower - click here for more

Environment a Real Winner - click here for more

Gas Engines Power Innovative Projects - click here for more

ABSA - click here for more

MTN goes off-grid with new data centre - click here for more 

MTN Tri-generation project - click here for more

HOW TO GET CONNECTED

  • Please contact our Customer Service department on 011 - 356 5000 or e-mail us at cservice@egoligas.co.za
  • You need to supply us with your address in order for us to verify whether you are on our gas network. 
  • We will send an Egoli Gas staff member to your business to verify where our pipeline runs and to point out where the connection point will be.
  • A qualified gas fitter will need to be employed to install the internal piping to the connection point at the
    boundary of the property. The gas fitter will issue a certificate of compliance.
  • Once we receive a completed application, with a copy of the relevant ID, proof of payment of the connection fee and
    deposit as well as the compliance certificate, a meter will be installed and the gas service connected.

Please note - To be successfully connected can take up to 8 weeks due to way leave, open trench way leaves and other council
applications which  Egoli Gas applies for.

It's simple, safe and cost-effective to convert to natural gasclick here